Cooling capacity

Results: 45



#Item
31Technology / Cooling capacity / British thermal unit / Seasonal energy efficiency ratio / Air conditioning / HVAC / Evaporator / Heating /  ventilating /  and air conditioning / Measurement / Engineering

CPH C ommercial 3- to 6-Ton Packaged Heat Pump 13 SEER / Up to 11.3 EER & 7.7 HSPF Cooling Capacity: 35,000 — 70,000 BTU/h

Add to Reading List

Source URL: www.goodmanmfg.com

Language: English - Date: 2013-05-20 10:51:56
32Engineering / Air conditioner / Air conditioning / HVAC / Evaporator / Condenser / Cooling capacity / Heat pump / Air handler / Heating /  ventilating /  and air conditioning / Technology / Mechanical engineering

CPC C ommercial 7½- to 12½-Ton Three-Phase Packaged Air Conditioners Up to 11.3 EER

Add to Reading List

Source URL: www.goodmanmfg.com

Language: English - Date: 2013-05-20 10:55:24
33Heating /  ventilating /  and air conditioning / Engineering / Mechanical engineering / Heat pumps / Air conditioner / Air conditioning / HVAC / Ampacity / Mac OS X Lion / Technology / Building engineering / Automation

CPC C ommercial 3- to 6-Ton Packaged Air Conditioners 13 SEER / Up to 11.3 EER Cooling Capacity: 34,600 — 71,000 BTU/h

Add to Reading List

Source URL: www.goodmanmfg.com

Language: English - Date: 2013-05-20 10:50:54
34British thermal unit / Anti-idling / Battery / Cooling capacity / Ampere-hour / Measurement / Heating /  ventilating /  and air conditioning / Customary units in the United States

  NITE Plus Fact Sheet Bergstrom Inc, has released a new and improved version of its No-Idle Thermal Environment (NITE) system called NITE Plus. It will be available Jan, 2009. What makes it better?

Add to Reading List

Source URL: www.navistarpartsandservice.com

Language: English - Date: 2011-12-01 18:31:25
35Propeller aircraft / Rolls-Royce Merlin / AgustaWestland AW101 / Canadair North Star / Aircraft engine / Hawker Hurricane / Swearingen Merlin / Aircraft / Aviation / Carrier-based aircraft

Project North Star Association of Canada June 2010 Merlin Musings a large cooling capacity was installed for the cooling

Add to Reading List

Source URL: www.projectnorthstar.ca

Language: English - Date: 2014-01-29 16:02:43
36Distributed computing / Mainframe computer / Data center / Disaster recovery / Data management / Concurrent computing / Computing

SDC Status: March 06, 2012 • Completing SDC Project re-scope – OB2 cooling demand is 125% of capacity – Phased plan will reduce demand by 25% - 30% over 18 months – 10 sub-projects, mostly funded with SDC constru

Add to Reading List

Source URL: cts.wa.gov

Language: English - Date: 2014-08-11 15:38:21
37Distributed computing / Mainframe computer / Data center / Disaster recovery / Data management / Concurrent computing / Computing

SDC Status: March 06, 2012 • Completing SDC Project re-scope – OB2 cooling demand is 125% of capacity – Phased plan will reduce demand by 25% - 30% over 18 months – 10 sub-projects, mostly funded with SDC constru

Add to Reading List

Source URL: cts.wa.gov

Language: English - Date: 2014-08-11 15:09:41
38Thermodynamics / Technology / Heat pumps / Engineering / Heat transfer / Wet-bulb temperature / Heat exchanger / Differential equation / Cooling capacity / Heating /  ventilating /  and air conditioning / Mechanical engineering / Building engineering

Fourth National Conference of IBPSA-USA New York City, New York August 11 – 13, 2010 SimBuild 2010

Add to Reading List

Source URL: www.ibpsa.us

Language: English - Date: 2010-10-13 11:37:53
39Technology / Air conditioner / British thermal unit / Breakpoint / Gold / Cooling capacity / Heating /  ventilating /  and air conditioning / Measurement / Chemistry

Ice Energy DES/DXAC Model Numbers

Add to Reading List

Source URL: www.energy.ca.gov

Language: English - Date: 2007-08-22 19:18:44
40Distributed computing / Mainframe computer / Data center / Disaster recovery / Data management / Concurrent computing / Computing

SDC Status: March 06, 2012 • Completing SDC Project re-scope – OB2 cooling demand is 125% of capacity – Phased plan will reduce demand by 25% - 30% over 18 months – 10 sub-projects, mostly funded with SDC constru

Add to Reading List

Source URL: www.cts.wa.gov

Language: English - Date: 2014-08-11 15:38:21
UPDATE